careers news & media events contact info site map  
  torrent   torrent pharmaceuticals limited  
 
   
 
Home  ::  Manufacturing  ::  Indrad Plant  ::  Facilities  ::  New Facility  
 

 

New Facility ::

Greenfield Insulin and Parenteral facility :

A Greenfield Insulin and Parenteral facility project is coming up at Indrad Plant. The project comprises of establishing and commissioning the new parenteral facility and shall cater to following product range.

  • Insulin (for exclusive supply to Novo Nordisk India Pvt Ltd (NNIPL)
  • Lyophilized Products (Vials)
  • Liquid Ampoules/vials

The facility will be designed according to cGMP and EU GMP standards and with logical and unidirectional flow for man and material movement in the entire manufacturing area. Provision for new process utility viz WFI and Clean Steam Generator, capacity 3 m3/hr. and 800 kg/hr resp. has been made. The civil structure will be constructed using prefabricated modular partitions.

Capacities ::

FACILITY
BASE UNIT
PRESENT
CAPACITY
PRESENT CAPACITY
Insulin
Lac Vials*
125*
150
Lyopholizer
Lac Vials
144
14.40
Ampoule Line
Lac Ampoules
150
300

*This will cater to market requirements for over a period of 5-6 years. Provision is made for additional line with similar capacity which can be added in the 5th year. The capacity shall stand enhanced to 300 lac vials pa on addition of the second line.


 
 
  Facilities »
 » Tablet Facility
 » Parentals Facility
 » Packaging Facility
 » Quality Control Facility
 » Active Pharmaceutical Ingredients Plant Facility
 » Supply Chain Management Facility
 » Engineering Services Facility

 

Copyright © 2003
careers faq news & media events contact info site map
^ TOP